Hadrian Energy Storage
101.2 MW storage in Wharton, TX · In queue since May 2023 · Proposed COD December 2028
101.2 MW
Capacity
1
Components
Battery
3 years
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
The Hadrian Energy Storage project is a proposed 101.2 MW battery storage project located in Wharton County, Texas. The project, developed by Hadrian Energy Storage, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0569, with a queue entry date of May 15, 2023. The proposed commercial operation date is December 31, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is at Line Tap 138kV #43012 NEWGLF60T3_8 - #43190 S_LANE_B138. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Wharton
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hadrian Energy Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Line Tap 138kV #43012 NEWGLF60T3_8 - #43190 S_LANE_B138
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Hadrian Energy Storage