Antoninus Energy Storage (ERCOT-24INR0589) — Project Summary

Queue ID
ERCOT-24INR0589
Capacity
101.2 MW
Technology
Battery
Status
active
Location
Wharton, TX
Region
ERCOT
Developer
Antoninus Energy Storage, LLC
IA Status
Facility Study

Antoninus Energy Storage

ERCOT-24INR0589BetaActiveBatteryERCOTLBNL

101.2 MW storage in Wharton, TX · In queue since June 2023 · Proposed COD June 2026

101.2 MW

Capacity

1

Components

Battery

2y 11m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

3 years

Facilities Study50%
Queue EntryJun 28, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-15

About

The Antoninus Energy Storage project is a proposed 101.2 MW battery storage project located in Wharton County, Texas. The project is being developed by Antoninus Energy Storage, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-24INR0589, with a queue entry date of June 28, 2023.

The proposed commercial operation date for the Antoninus Energy Storage project is June 15, 2026. Its interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV #43190 S_LANE_B138 - #42985 DYANN_POI_8 Transmission Line.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Wharton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Antoninus Energy Storage, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV #43190 S_LANE_B138 - #42985 DYANN_POI_8 Transmission Line.

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.