Mustang Bayou BESS (ERCOT-24INR0599) — Project Summary

Queue ID
ERCOT-24INR0599
Capacity
9.99 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Maverick Clean Energy Center
IA Status
IA Executed

Mustang Bayou BESS

ERCOT-24INR0599BetaActiveBatteryERCOTLBNL

9.99 MW storage in Brazoria, TX · Proposed COD April 2025

9.99 MW

Capacity

1

Components

Battery

In Queue

IA Executed

IA Status

Signed Oct 2023

Interconnection

IA → COD

1y 6m

Schedule

13 months past proposed COD

Construction75%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 31, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2025-04-15

About

The Mustang Bayou BESS is a proposed 9.99 MW battery storage project located in Brazoria County, Texas. Developed by Maverick Clean Energy Center, the project is interconnected within the ERCOT region under queue ID ERCOT-24INR0599. The proposed commercial operation date is April 15, 2025.

The project's Interconnection Agreement (IA) has been executed as of October 31, 2023. The Point of Interconnection (POI) is at station MU, load transformer TR2, bus number 42960, at a transmission level voltage of 138kV. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Maverick Clean Energy Center

Utility

Entity

ERCOT

Service Type

Point of Interconnection

STATION NAME (TSP STATION CODE) = MU LOAD/LOAD TRANSFORMER NAME = TR2 PTI BUS NUMBER = 42960 VOLTAGE (TRANSMISSION LEVEL) = 138KV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Mustang Bayou BESS