CPS Rio Nogales CT301 Rotor Replacement
3.1 MW generation in Guadalupe, TX · In queue since July 2023 · Proposed COD February 2025
3.1 MW
Capacity
1
Components
Gas
2y 10m
In Queue
IA Executed
IA Status
Signed Nov 2023
Queue → IA
4 months
IA → COD
1y 3m
Total Duration
4 months
Schedule
15 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 24–48 months
Proposed COD: 2025-02-01
The CPS Rio Nogales CT301 Rotor Replacement is a proposed 3.1 MW gas-fired generation project located in Guadalupe County, Texas. The project, developed by CPS Energy, is interconnected within the ERCOT region under queue ID ERCOT-24INR0602. The project entered the interconnection queue on July 6, 2023, with a proposed commercial operation date of February 1, 2025.
The interconnection agreement for the project was executed on November 10, 2023. The point of interconnection is the 5362 RIONOG 345kV substation. The project is linked to an existing operating plant.
Generated from interconnection queue and public data sources
State
TX
County
Guadalupe
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
CPS Energy
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5362 RIONOG 345kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about CPS Rio Nogales CT301 Rotor Replacement