Anemoi Energy Storage Repowering (ERCOT-24INR0636) — Project Summary

Queue ID
ERCOT-24INR0636
Capacity
5 MW
Technology
Battery
Status
active
Location
Hidalgo, TX
Region
ERCOT
Developer
Anemoi Energy Storage, LLC
IA Status
Facility Study

Anemoi Energy Storage Repowering

ERCOT-24INR0636BetaActiveBatteryERCOTLBNL

5 MW storage in Hidalgo, TX · In queue since October 2023 · Proposed COD February 2025

5 MW

Capacity

1

Components

Battery

2y 7m

In Queue

Facility Study

IA Status

COD target: 2025

Interconnection

Total Duration

1y 4m

Schedule

14 months past proposed COD

Facilities Study50%
Queue EntryOct 30, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-02-28

About

The Anemoi Energy Storage Repowering project is a proposed 5 MW battery storage project located in Hidalgo County, Texas. Developed by Anemoi Energy Storage, LLC, the project entered the ERCOT interconnection queue as queue ID ERCOT-24INR0636 on October 30, 2023. Its proposed commercial operation date is February 28, 2025, and its interconnection status is currently in the Facility Study phase.

The project consists of a single 5 MW battery component. The point of interconnection is the 8574 POMELO 345kV substation. The project is listed as active in the ERCOT queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hidalgo

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Anemoi Energy Storage, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

8574 POMELO 345kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ANEM_ESS_RN
POI Substation
Pomelo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Anemoi Energy Storage Repowering