Empire Central BESS (ERCOT-24INR0659) — Project Summary

Queue ID
ERCOT-24INR0659
Capacity
9.95 MW
Technology
Battery
Status
active
Location
Dallas, TX
Region
ERCOT
Developer
SMT Dallas III LLC
IA Status
In Progress (unknown study)

Empire Central BESS

ERCOT-24INR0659BetaActiveBatteryERCOTLBNL

9.95 MW storage in Dallas, TX · In queue since January 2024 · Proposed COD June 2025

9.95 MW

Capacity

1

Components

Battery

2y 4m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

1y 5m

Schedule

11 months past proposed COD

In Study38%
Queue EntryJan 29, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-06-01

About

The Empire Central BESS project is a proposed 9.95 MW battery storage project located in Dallas County, Texas. Developed by SMT Dallas III LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-24INR0659. The project entered the queue on January 29, 2024, with a proposed commercial operation date of June 1, 2025.

The interconnection agreement (IA) status for the Empire Central BESS project is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is at station EMPCT, load LDLXFMR2, transformer number 2, bus number 2799, at a voltage of 138kV. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Dallas

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

SMT Dallas III LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Station name: EMPCT, Load name: LDLXFMR2, XFMR Number: 2, Bus Number:2799, Voltage: 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Empire Central BESS