BasRanch (TEF - Due Diligence)
1,350 MW generation in Ward, TX · In queue since August 2020 · Proposed COD December 2028
1,350 MW
Capacity
1
Components
Gas
5y 9m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
8y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
The BasRanch (TEF - Due Diligence) project is a proposed 1350 MW natural gas generation facility in Ward County, Texas. Developed by CPV Basin Ranch, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0008, with a queue entry date of August 4, 2020. The proposed commercial operation date is December 1, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The proposed project consists of 1350 MW of natural gas-fired generation. The point of interconnection is a tap on the 345kV line between the Riverton Switch and the Sand Lake Switch. The BasRanch project has been the subject of recent news coverage related to regulatory matters.
Generated from interconnection queue and public data sources
State
TX
County
Ward
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
CPV Basin Ranch, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 345kV Riverton Switch - Sand Lake Switch
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.