Peregrine BESS 2
150 MW storage in Goliad, TX · In queue since August 2022 · Proposed COD July 2027
150 MW
Capacity
1
Components
Battery
3y 9m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-07-01
The Peregrine BESS 2 project is a proposed 150 MW battery energy storage system located in Goliad County, Texas. Developed by CED Development Inc., the project consists of a single 150 MW battery component. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0078, with an interconnection queue date of August 5, 2022.
The proposed commercial operation date for Peregrine BESS 2 is July 1, 2027. The project's interconnection status is currently in the Facility Study phase, and its point of interconnection is the 8673 RAPTOR7A 345kV location. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Goliad
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
CED Development Inc.
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
8673 RAPTOR7A 345kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Peregrine BESS 2