Reis Solar (ERCOT-25INR0082) — Project Summary

Queue ID
ERCOT-25INR0082
Capacity
105.48 MW
Technology
Solar
Status
active
Location
Atascosa, TX
Region
ERCOT
Developer
Greenalia Solar Power Reis LLC
IA Status
Facility Study

Reis Solar

ERCOT-25INR0082BetaActiveSolarERCOTLBNL + Live

105.48 MW generation in Atascosa, TX · In queue since June 2022 · Proposed COD August 2027

105.48 MW

Capacity

1

Components

Solar

3y 11m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

5y 2m

Facilities Study50%
Queue EntryJun 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-08-03

About

The Reis Solar project is a proposed 105.48 MW solar generation facility in Atascosa County, Texas. Developed by Greenalia Solar Power Reis LLC, the project consists of 105.48 MW of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-25INR0082, with a queue entry date of June 2, 2022, and a proposed commercial operation date of August 3, 2027. The project's interconnection agreement status is currently in the Facility Study phase.

The proposed project is linked to the existing Reis Solar Park operating plant (EIA ID 67564). Interconnection will be at a tap into the 138 kV line from Choke Canyon AEP to San Miguel Gen. The Reis Solar project has been the subject of recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Atascosa

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Greenalia Solar Power Reis LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tapping into 138 kV line (5689) Choke Canyon AEP to (5902) San Miguel Gen

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
SAN_SANMIGG1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Reis Solar