Soleil Solar
728.72 MW generation in Clay, TX · In queue since September 2022 · Proposed COD December 2028
728.72 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
6y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-28
Soleil Solar is a proposed 728.72 MW solar generation project located in Clay County, Texas. The project, developed by Soleil Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0097, with a queue entry date of September 2, 2022. The proposed commercial operation date is December 28, 2028, and the project's interconnection status is currently in the Facility Study phase.
The Soleil Solar project has been the subject of recent news coverage, with two articles categorized under the industry sector. The point of interconnection is Tap 345 kV 1730 Krum West Switch - 6111 Riley ckt 2.
Generated from interconnection queue and public data sources
State
TX
County
Clay
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Soleil Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 1730 Krum West Switch - 6111 Riley ckt 2
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-14
View all articlesTop solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.