Diver Solar SLF (ERCOT-25INR0105) — Project Summary

Queue ID
ERCOT-25INR0105
Capacity
225.59 MW
Technology
Solar
Status
active
Location
Limestone, TX
Region
ERCOT
Developer
Diver Solar
IA Status
IA Executed

Diver Solar SLF

ERCOT-25INR0105BetaActiveSolarERCOTLBNL

225.59 MW generation in Limestone, TX · In queue since September 2022 · Proposed COD June 2026

225.59 MW

Capacity

1

Components

Solar

3y 8m

In Queue

IA Executed

IA Status

Signed Oct 2023

Interconnection

Queue → IA

1y 1m

IA → COD

2y 8m

Total Duration

1y 1m

Construction75%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 27, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-06-30

About

Diver Solar SLF is a proposed 225.59 MW solar generation project located in Limestone County, Texas. The developer is Diver Solar. The project is interconnected within the ERCOT region under queue ID ERCOT-25INR0105, with an interconnection queue entry date of September 2, 2022, and a proposed commercial operation date of June 30, 2026. The project's Interconnection Agreement (IA) was executed on October 27, 2023.

The proposed project is linked to the existing Diver Solar, LLC operating plant (EIA plant ID 68483). Recent news coverage has discussed the project in the context of industry and grid developments.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Limestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Diver Solar

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 3384 St Johns - 3390 Jewett

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Diver Solar SLF