August Draw Energy
250 MW generation in Reeves, TX · In queue since September 2022 · Proposed COD June 2028
250 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-27
August Draw Energy is a proposed 250 MW solar generation project located in Reeves County, Texas. Developed by DBR Solar, LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-25INR0112. The project entered the interconnection queue on September 15, 2022, and has a proposed commercial operation date of June 27, 2028. Its interconnection status is currently in the Facility Study phase.
The August Draw Energy project has been mentioned in recent news coverage related to industry and development.
Generated from interconnection queue and public data sources
State
TX
County
Reeves
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
DBR Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 60207 Verhalen _x0013_ 60808 Hoefs Road
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about August Draw Energy