Vial BESS (ERCOT-25INR0122) — Project Summary

Queue ID
ERCOT-25INR0122
Capacity
135.18 MW
Technology
Battery
Status
active
Location
Hill, TX
Region
ERCOT
Developer
Gransolar Texas Eleven LLC
IA Status
Facility Study

Vial BESS

ERCOT-25INR0122BetaActiveBatteryERCOTLBNL + Live

135.18 MW storage in Hill, TX · In queue since July 2022 · Proposed COD September 2027

135.18 MW

Capacity

1

Components

Battery

3y 10m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

5y 2m

Facilities Study50%
Queue EntryJul 5, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-15

About

The Vial BESS project is a proposed 135.18 MW battery storage project located in Hill County, Texas. Developed by Gransolar Texas Eleven LLC, the project consists entirely of battery storage. It is listed in the ERCOT interconnection queue as entry ERCOT-25INR0122, with a queue entry date of July 5, 2022, and a proposed commercial operation date of September 15, 2027. The project's interconnection status is currently in the Facility Study phase.

The proposed project is linked to an existing operating plant named Vial BESS (EIA plant ID 67784). The point of interconnection is Chatt(234) - Pecan Street (3352) 138kV. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hill

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gransolar Texas Eleven LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Chatt(234) - Pecan Street (3352) 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
HIGH

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.