Fiji Solar (ERCOT-25INR0128) — Project Summary

Queue ID
ERCOT-25INR0128
Capacity
202.7 MW
Technology
Solar
Status
active
Location
Limestone, TX
Region
ERCOT
Developer
Fiji Solar
IA Status
Facility Study

Fiji Solar

ERCOT-25INR0128BetaActiveSolarERCOTLBNL

202.7 MW generation in Limestone, TX · In queue since September 2022 · Proposed COD August 2028

202.7 MW

Capacity

1

Components

Solar

3y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5y 11m

Facilities Study50%
Queue EntrySep 27, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-08-30

About

Fiji Solar is a proposed solar generation project located in Limestone County, Texas, within the ERCOT region. The project, with a total capacity of 202.7 MW, is being developed by Fiji Solar. It consists of 202.7 MW of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-25INR0128, with a queue entry date of September 27, 2022. The proposed commercial operation date is August 30, 2028, and its interconnection status is currently in the Facility Study phase. The point of interconnection is the Groesbeck Main (#3634) to Mexia (#3632) 138 kV line tap (Oncor Electric Delivery). The Fiji Solar project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Limestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Fiji Solar

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Groesbeck Main (#3634) to Mexia (#3632) 138 kV line tap (Oncor Electric Delivery)

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.