Hoskins Solar
204.12 MW generation in Lamar, TX · In queue since October 2022 · Proposed COD August 2026
204.12 MW
Capacity
1
Components
Solar
3y 7m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-08-31
Hoskins Solar is a proposed 204.12 MW solar generation project located in Lamar County, Texas. The project, developed by SGT HOSKINS SOLAR PROJECT, LLC, is interconnected within the ERCOT region under queue ID ERCOT-25INR0134. The project entered the interconnection queue on October 24, 2022, and has a proposed commercial operation date of August 31, 2026. Its interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing SGT Hoskins Solar Project Hybrid operating plant (EIA ID 67341). Hoskins Solar has been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Lamar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
SGT HOSKINS SOLAR PROJECT, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
TAP 138 kV 1687 BLOSSOM_T8 - 1771 LAMARBM1_8
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- HIGH
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26