Champaign BESS
201.13 MW storage in Glasscock, TX · In queue since September 2022 · Proposed COD June 2027
201.13 MW
Capacity
1
Components
Battery
3y 8m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-06-28
Champaign BESS is a proposed 201.13 MW battery storage project located in Glasscock County, Texas. The developer is Champaign BESS, LLC. The project consists of 201.13 MW of battery capacity. It is interconnected within the ERCOT queue as entry ERCOT-25INR0138, with a queue entry date of September 21, 2022, and a proposed commercial operation date of June 28, 2027. The project's interconnection agreement status is currently in the Facility Study phase.
The proposed project is linked to the existing operating Champaign BESS, LLC facility (EIA ID 67917). The project has been mentioned in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Glasscock
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Champaign BESS, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV Shaw POD (18664) _x0013_ Desert Wind Sub (11222) new station Potterson Lake Switch
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- HIGH
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Champaign BESS