Dolce BESS
100.65 MW storage in Mitchell, TX · In queue since September 2022 · Proposed COD January 2028
100.65 MW
Capacity
1
Components
Battery
3y 8m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-01-31
Dolce BESS is a proposed 100.65 MW battery storage project located in Mitchell County, Texas. The project, developed by Dolce BESS, LLC, is interconnected within the ERCOT region under queue ID ERCOT-25INR0139. The project entered the interconnection queue on September 27, 2022, and has a proposed commercial operation date of January 31, 2028. Its interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing operating Dolce BESS, LLC facility (EIA ID 67919). Recent news coverage has highlighted industry aspects of the Dolce BESS project.
Generated from interconnection queue and public data sources
State
TX
County
Mitchell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Dolce BESS, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 1189 BARBER_LK1_8 - 19520 CHINAGRVX2_8
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
- POI Substation
- China Grove Switching Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26