Dolce BESS (ERCOT-25INR0139) — Project Summary

Queue ID
ERCOT-25INR0139
Capacity
100.65 MW
Technology
Battery
Status
active
Location
Mitchell, TX
Region
ERCOT
Developer
Dolce BESS, LLC
IA Status
Facility Study

Dolce BESS

ERCOT-25INR0139BetaActiveBatteryERCOTLBNL + Live

100.65 MW storage in Mitchell, TX · In queue since September 2022 · Proposed COD January 2028

100.65 MW

Capacity

1

Components

Battery

3y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Status
Latest milestoneEPC contract awarded · 2024-12-17Business Wire · 2024-12-17
Interconnection

Total Duration

5y 4m

Facilities Study50%
Queue EntrySep 27, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-01-31

About

Dolce BESS is a proposed 100.65 MW battery storage project located in Mitchell County, Texas. The project, developed by Dolce BESS, LLC, is interconnected within the ERCOT region under queue ID ERCOT-25INR0139. The project entered the interconnection queue on September 27, 2022, and has a proposed commercial operation date of January 31, 2028. Its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing operating Dolce BESS, LLC facility (EIA ID 67919). Recent news coverage has highlighted industry aspects of the Dolce BESS project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Mitchell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Dolce BESS, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 1189 BARBER_LK1_8 - 19520 CHINAGRVX2_8

Data Source

LBNL + Live

EPC contractorJones PowerBusiness Wire · 2024-12-17
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW
POI Substation
China Grove Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (2)Beta

Last updated 2026-03-26

View all articles

No ask pi reports yet for this entity.

ask pi about Dolce BESS