Academy Wind (ERCOT-25INR0151) — Project Summary

Queue ID
ERCOT-25INR0151
Capacity
304.56 MW
Technology
Wind
Status
suspended
Location
Dickens, TX
Region
ERCOT
Developer
IA Status

Academy Wind

ERCOT-25INR0151BetaSuspendedWindERCOTLBNL

304.56 MW generation in Dickens, TX · In queue since September 2022

304.56 MW

Capacity

1

Components

Wind

3y 8m

In Queue

IA Status

Interconnection

Total Duration

3y 8m

Suspended0%
Queue EntrySep 15, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

Academy Wind is a proposed 304.56 MW wind generation project located in Dickens County, Texas. The project, developed within the ERCOT region, entered the ERCOT interconnection queue as entry 25INR0151 on September 15, 2022. Its current status is listed as suspended.

The proposed project consists solely of wind generation with a total capacity of 304.56 MW. Academy Wind has been the subject of recent news coverage related to the energy industry.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Dickens

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Utility

Entity

ERCOT

Service Type

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.