Padrino Solar
201.4 MW generation in Hill, TX · In queue since September 2022 · Proposed COD July 2026
201.4 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-07-30
The Padrino Solar project is a proposed 201.4 MW solar generation facility in Hill County, Texas. The project, developed by Hill Solar II, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0166, with a queue entry date of September 15, 2022. The proposed commercial operation date is July 30, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.
The point of interconnection for Padrino Solar is the Tap 345kV 68090 Sam Switch _x0013_ 3389 Fort Smith. The project consists of 201.4 MW of solar photovoltaic generation.
Generated from interconnection queue and public data sources
State
TX
County
Hill
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hill Solar II, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 68090 Sam Switch _x0013_ 3389 Fort Smith
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Padrino Solar