Pinewood Solar (ERCOT-25INR0170) — Project Summary

Queue ID
ERCOT-25INR0170
Capacity
150.68 MW
Technology
Solar
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Brazoria Solar II, LLC
IA Status
Facility Study

Pinewood Solar

ERCOT-25INR0170BetaActiveSolarERCOTLBNL + Live

150.68 MW generation in Brazoria, TX · In queue since September 2022 · Proposed COD April 2028

150.68 MW

Capacity

1

Components

Solar

3y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5y 7m

Facilities Study50%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-14

About

Pinewood Solar is a proposed 150.68 MW solar generation project located in Brazoria County, Texas. The developer is Brazoria Solar II, LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0170, with a queue entry date of September 2, 2022. The proposed commercial operation date is April 14, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 150.68 MW of solar photovoltaic generation. The point of interconnection is the 43020 Seabreeze 345kV substation. The project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Brazoria Solar II, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

43020 Seabreeze 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Pinewood Solar