Triangle Ranch Alpha
301.74 MW generation in Cottle, TX · In queue since October 2022 · Proposed COD July 2029
301.74 MW
Capacity
1
Components
Wind
3y 7m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
6y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-01
Triangle Ranch Alpha is a proposed wind generation project with a total capacity of 301.74 MW. The project is located in Cottle County, Texas, within the ERCOT region. Developed by Triangle Ranch Wind, it entered the ERCOT interconnection queue as entry 25INR0177 on October 6, 2022. The proposed commercial operation date is July 1, 2029, and the project's interconnection status is currently in the Facility Study phase.
The proposed project consists of 301.74 MW of wind generation capacity. It is interconnected at the Edith Clark 345 kV substation. The project has appeared in recent news coverage regarding renewable energy development in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Cottle
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Triangle Ranch Wind
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Edith Clark 345 kV (#60500)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.