Triangle Ranch Bravo
200.22 MW generation in Cottle, TX · In queue since October 2022 · Proposed COD July 2028
200.22 MW
Capacity
1
Components
Wind
3y 7m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-01
Triangle Ranch Bravo is a proposed 200.22 MW wind generation project located in Cottle County, Texas. The project, developed by Triangle Ranch Wind, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0178, with a queue entry date of October 6, 2022. The proposed commercial operation date is July 1, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Edith Clark 345 kV substation (#60500). The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
TX
County
Cottle
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Triangle Ranch Wind
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Edith Clark 345 kV (#60500)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Triangle Ranch Bravo