Legato BESS (ERCOT-25INR0184) — Project Summary

Queue ID
ERCOT-25INR0184
Capacity
202.65 MW
Technology
Battery
Status
active
Location
Wise, TX
Region
ERCOT
Developer
Legato Storage, LLC
IA Status
Facility Study

Legato BESS

ERCOT-25INR0184BetaActiveBatteryERCOTLBNL + Live

202.65 MW storage in Wise, TX · In queue since September 2022 · Proposed COD April 2028

202.65 MW

Capacity

1

Components

Battery

3y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5y 7m

Facilities Study50%
Queue EntrySep 27, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-24

About

The Legato BESS project is a proposed 202.65 MW battery storage project located in Wise County, Texas. Developed by Legato Storage, LLC, the project consists entirely of battery storage. It is currently in the ERCOT interconnection queue as entry ERCOT-25INR0184, with a queue entry date of September 27, 2022, and a proposed commercial operation date of April 24, 2028.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 138kV #608 Crafton Substation - #620 Bowie Substation. The Legato BESS project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Wise

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Legato Storage, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

138kV #608 Crafton Substation - #620 Bowie Substation

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Substation 41

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Legato BESS