Nockenut Springs Solar 4 (ERCOT-25INR0193) — Project Summary

Queue ID
ERCOT-25INR0193
Capacity
201.15 MW
Technology
Solar
Status
active
Location
Gonzales, TX
Region
ERCOT
Developer
Pecan Springs Energy, LLC
IA Status
Facility Study

Nockenut Springs Solar 4

ERCOT-25INR0193BetaActiveSolarERCOTLBNL + Live

201.15 MW generation in Gonzales, TX · In queue since September 2022 · Proposed COD June 2029

201.15 MW

Capacity

1

Components

Solar

3y 8m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

6y 9m

Facilities Study50%
Queue EntrySep 15, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-05

About

Nockenut Springs Solar 4 is a proposed 201.15 MW solar generation project located in Gonzales County, Texas. The project, developed by Pecan Springs Energy, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0193, with a queue entry date of September 15, 2022. The proposed commercial operation date is June 5, 2029.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 345 kV Elm Creek - South Texas Project Line (Bus #5133 - #5915).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Gonzales

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Pecan Springs Energy, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

The 345 kV Elm Creek - South Texas Project Line (Bus #5133 - #5915)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
South Texas Project Tap

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.