Photo Solar 1
150 MW generation in Uvalde, TX · In queue since September 2022 · Proposed COD May 2027
150 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-05-31
Photo Solar 1 is a proposed 150 MW solar generation project located in Uvalde County, Texas. The project, being developed by CED Development Inc., is in the ERCOT interconnection queue as entry ERCOT-25INR0194, with a queue entry date of September 15, 2022. The proposed commercial operation date is May 31, 2027, and the project's interconnection status is currently in the Facility Study phase.
The Photo Solar 1 project has been the subject of recent news coverage, with 10 articles published about it. These articles primarily focus on grid-related topics, with additional coverage of industry and regulatory aspects.
Generated from interconnection queue and public data sources
State
TX
County
Uvalde
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
CED Development Inc.
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5885 Downie 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HELIOS_RN
- POI Substation
- Downie Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Photo Solar 1