Photo Solar 2 (ERCOT-25INR0195) — Project Summary

Queue ID
ERCOT-25INR0195
Capacity
300 MW
Technology
Solar
Status
active
Location
Uvalde, TX
Region
ERCOT
Developer
CED Development Inc.
IA Status
Facility Study

Photo Solar 2

ERCOT-25INR0195BetaActiveSolarERCOTLBNL + Live

300 MW generation in Uvalde, TX · In queue since September 2022 · Proposed COD May 2027

300 MW

Capacity

1

Components

Solar

3y 8m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 8m

Facilities Study50%
Queue EntrySep 15, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-05-31

About

Photo Solar 2 is a proposed 300 MW solar generation project located in Uvalde County, Texas. The developer is CED Development Inc. The project is in the ERCOT interconnection queue as entry ERCOT-25INR0195, with a queue entry date of September 15, 2022, and a proposed commercial operation date of May 31, 2027. Its interconnection status is currently in the Facility Study phase.

The proposed project consists of 300 MW of solar photovoltaic generation. Photo Solar 2 has been the subject of recent news coverage, with 21 articles categorized as industry, regulatory, and grid-related.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Uvalde

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

CED Development Inc.

Utility

Entity

ERCOT

Service Type

Point of Interconnection

5885 Downie 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HELIOS_RN
POI Substation
Downie Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.