XE Bonham Solar 1 (ERCOT-25INR0199) — Project Summary

Queue ID
ERCOT-25INR0199
Capacity
138.4 MW
Technology
Solar
Status
active
Location
Limestone, TX
Region
ERCOT
Developer
J&J Solar Ranch LLC
IA Status
IA Executed

XE Bonham Solar 1

ERCOT-25INR0199BetaActiveSolarERCOTLBNL + Live

138.4 MW generation in Limestone, TX · In queue since November 2022 · Proposed COD April 2027

138.4 MW

Capacity

1

Components

Solar

3y 6m

In Queue

IA Executed

IA Status

Signed Aug 2024

Interconnection

Queue → IA

1y 9m

IA → COD

2y 8m

Total Duration

1y 9m

Construction75%
Queue EntryNov 15, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 7, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-04-06

About

The XE Bonham Solar 1 project is a proposed solar generation facility with a total capacity of 138.4 MW. It is located in Limestone County, Texas, within the ERCOT region. The developer is J&J Solar Ranch LLC.

The project is listed in the ERCOT interconnection queue as entry ERCOT-25INR0199, with a queue entry date of November 15, 2022, and a proposed commercial operation date of April 6, 2027. The project's Interconnection Agreement (IA) has been executed as of August 7, 2024.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Limestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

J&J Solar Ranch LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

TAP 138 kV MEXIA_2_1_8 3632 - GROES_SE1_8 3634

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.