Claxton Solar
150.64 MW generation in Hopkins, TX · In queue since September 2022 · Proposed COD September 2027
150.64 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
5 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-17
The proposed Claxton Solar project is a 150.64 MW solar generation facility in Hopkins County, Texas. It is being developed by BT Claxton Solar, LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0204, with a queue entry date of September 21, 2022, and a proposed commercial operation date of September 17, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is planned for a tap on the 345kV line between the Allen Switch (#2514) and Monticello (#1696).
Generated from interconnection queue and public data sources
State
TX
County
Hopkins
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BT Claxton Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV line between Allen Switch (#2514) and Monticello (#1696)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Claxton Solar