Claxton Storage (ERCOT-25INR0205) — Project Summary

Queue ID
ERCOT-25INR0205
Capacity
75.7 MW
Technology
Battery
Status
active
Location
Hopkins, TX
Region
ERCOT
Developer
BT Claxton Solar, LLC
IA Status
Facility Study

Claxton Storage

ERCOT-25INR0205BetaActiveBatteryERCOTLBNL

75.7 MW storage in Hopkins, TX · In queue since September 2022 · Proposed COD September 2027

75.7 MW

Capacity

1

Components

Battery

3y 8m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

5 years

Facilities Study50%
Queue EntrySep 21, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-17

About

The Claxton Storage project is a proposed 75.7 MW battery storage project located in Hopkins County, Texas. The developer is BT Claxton Solar, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-25INR0205, with a queue entry date of September 21, 2022, and a proposed commercial operation date of September 17, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is the tap 345kV line between Allen Switch (#2514) and Monticello (#1696). The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hopkins

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BT Claxton Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV line between Allen Switch (#2514) and Monticello (#1696)

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.