Austin Bayou Storage II (ERCOT-25INR0236) — Project Summary

Queue ID
ERCOT-25INR0236
Capacity
150.68 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Austin Bayou Solar, LLC
IA Status
Facility Study

Austin Bayou Storage II

ERCOT-25INR0236BetaActiveBatteryERCOTLBNL

150.68 MW storage in Brazoria, TX · In queue since March 2023 · Proposed COD June 2027

150.68 MW

Capacity

1

Components

Battery

3y 2m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntryMar 8, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-01

About

Austin Bayou Storage II is a proposed battery storage project located in Brazoria County, Texas, with a total capacity of 150.68 MW. Developed by Austin Bayou Solar, LLC, the project consists entirely of battery storage. It is currently in the ERCOT interconnection queue as entry ERCOT-25INR0236, with a queue entry date of March 8, 2023, and a proposed commercial operation date of June 1, 2027. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection (POI) is Tap 345kV 43180 Savanna - 43020 Seabreeze Ckt 27 AND 43035 Oasis - 43060 Speedway Ckt 18. The project has been mentioned in recent news articles related to industry and regulatory matters.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Austin Bayou Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 43180 Savanna - 43020 Seabreeze Ckt 27 AND 43035 Oasis - 43060 Speedway Ckt 18

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Austin Bayou Storage II