Cosper Solar (ERCOT-25INR0281) — Project Summary

Queue ID
ERCOT-25INR0281
Capacity
148.16 MW
Technology
Solar
Status
active
Location
Bell, TX
Region
ERCOT
Developer
Gransolar Texas Twenty LLC
IA Status
Facility Study

Cosper Solar

ERCOT-25INR0281BetaActiveSolarERCOTLBNL + Live

148.16 MW generation in Bell, TX · In queue since January 2023 · Proposed COD November 2027

148.16 MW

Capacity

1

Components

Solar

3y 4m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 10m

Facilities Study50%
Queue EntryJan 3, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-11-12

About

The Cosper Solar project is a proposed 148.16 MW solar generation facility in Bell County, Texas. Developed by Gransolar Texas Twenty LLC, the project is interconnected within the ERCOT region and entered the interconnection queue as ERCOT-25INR0281 on January 3, 2023. The proposed commercial operation date is November 12, 2027, and the project's interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Cosper Solar operating plant (EIA ID 67773).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gransolar Texas Twenty LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 115 Ding Dong - 3630 Copperas Cove Tu

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Ding Dong Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.