Railway BESS
254.8 MW storage in Rusk, TX · In queue since January 2023 · Proposed COD June 2028
254.8 MW
Capacity
1
Components
Battery
3y 4m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-01
The Railway BESS project is a proposed 254.8 MW battery storage project located in Rusk County, Texas. Developed by Grand Reserve Energy, LLC, the project consists of 254.8 MW of battery capacity. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0284, with a queue entry date of January 30, 2023.
The proposed commercial operation date for the Railway BESS project is June 1, 2028. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the Martin Lake Switch (3100) _x0013_ Elkton (3105) 345 kV Line.
Generated from interconnection queue and public data sources
State
TX
County
Rusk
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Grand Reserve Energy, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Martin Lake Switch (3100) _x0013_ Elkton (3105) 345 kV Line
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Railway BESS