Railway BESS (ERCOT-25INR0284) — Project Summary

Queue ID
ERCOT-25INR0284
Capacity
254.8 MW
Technology
Battery
Status
active
Location
Rusk, TX
Region
ERCOT
Developer
Grand Reserve Energy, LLC
IA Status
Facility Study

Railway BESS

ERCOT-25INR0284BetaActiveBatteryERCOTLBNL

254.8 MW storage in Rusk, TX · In queue since January 2023 · Proposed COD June 2028

254.8 MW

Capacity

1

Components

Battery

3y 4m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5y 5m

Facilities Study50%
Queue EntryJan 30, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

About

The Railway BESS project is a proposed 254.8 MW battery storage project located in Rusk County, Texas. Developed by Grand Reserve Energy, LLC, the project consists of 254.8 MW of battery capacity. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0284, with a queue entry date of January 30, 2023.

The proposed commercial operation date for the Railway BESS project is June 1, 2028. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the Martin Lake Switch (3100) _x0013_ Elkton (3105) 345 kV Line.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Rusk

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Grand Reserve Energy, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Martin Lake Switch (3100) _x0013_ Elkton (3105) 345 kV Line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.