XE Flying Kite Solar
80.38 MW generation in Zavala, TX · In queue since April 2023 · Proposed COD December 2027
80.38 MW
Capacity
1
Components
Solar
3y 1m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-30
The XE Flying Kite Solar project is a proposed 80.38 MW solar generation facility in Zavala County, Texas. The project, being developed by FLYING KITE SOLAR LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0304, with a queue entry date of April 7, 2023. The proposed commercial operation date is December 30, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is planned to tap the 69kV La Pryor (#8672) - Uvalde (#8231) Line, managed by AEP. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
TX
County
Zavala
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
FLYING KITE SOLAR LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap the 69kV La Pryor (#8672) - Uvalde (#8231) Line; AEP
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about XE Flying Kite Solar