Staked Plains BESS (ERCOT-25INR0313) — Project Summary

Queue ID
ERCOT-25INR0313
Capacity
254.8 MW
Technology
Battery
Status
active
Location
Lubbock, TX
Region
ERCOT
Developer
Grand Reserve Energy, LLC
IA Status
IA Executed

Staked Plains BESS

ERCOT-25INR0313BetaActiveBatteryERCOTLBNL

254.8 MW storage in Lubbock, TX · In queue since March 2023 · Proposed COD June 2028

254.8 MW

Capacity

1

Components

Battery

3y 2m

In Queue

IA Executed

IA Status

Signed Oct 2024

Interconnection

Queue → IA

1y 7m

IA → COD

3y 8m

Total Duration

1y 7m

Construction75%
Queue EntryMar 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 29, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-06-01

About

The Staked Plains BESS is a proposed battery storage project located in Lubbock County, Texas, with a total capacity of 254.8 MW. Developed by Grand Reserve Energy, LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue under queue ID ERCOT-25INR0313, with an interconnection queue entry date of March 13, 2023.

The proposed commercial operation date for the Staked Plains BESS project is June 1, 2028. An Interconnection Agreement (IA) has been executed for the project on October 29, 2024. The point of interconnection (POI) is the 345kV Dunbar Double Mountain Switch (Bus# 23928).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Lubbock

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Grand Reserve Energy, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

345kV Dunbar Double Mountain Switch (Bus# 23928)

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.