Silver Fox Solar
101.2 MW generation in Grayson, TX · In queue since July 2023 · Proposed COD May 2026
101.2 MW
Capacity
1
Components
Solar
2y 10m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
2y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-05-31
The Silver Fox Solar project is a proposed solar generation facility with a total capacity of 101.2 MW. It is located in Grayson County, Texas, and is being developed by Industrial Lima Project LLC. The project is currently active in the ERCOT interconnection queue under queue ID ERCOT-25INR0318, with an interconnection queue entry date of July 31, 2023. The proposed commercial operation date is May 31, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.
The Silver Fox Solar project has been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Grayson
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Industrial Lima Project LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
12677 Haggerty Switch 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Silver Fox Solar