El Molino Solar SLF
201.32 MW generation in Webb, TX · In queue since January 2023 · Proposed COD September 2027
201.32 MW
Capacity
1
Components
Solar
3y 4m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-01
The El Molino Solar SLF project is a proposed 201.32 MW solar generation facility in Webb County, Texas. Developed by El Molino Solar, LLC, the project consists of 201.32 MW of solar capacity.
The project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0321, with a queue entry date of January 17, 2023. Its proposed commercial operation date is September 1, 2027. The project's interconnection status is currently in the Facility Study phase, and its point of interconnection is the 138kV Bruni 8297.
Generated from interconnection queue and public data sources
State
TX
County
Webb
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
El Molino Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138kV Bruni 8297
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about El Molino Solar SLF