Wallie Storage (ERCOT-25INR0361) — Project Summary

Queue ID
ERCOT-25INR0361
Capacity
205.4 MW
Technology
Battery
Status
active
Location
Howard, TX
Region
ERCOT
Developer
Wallie Storage, LLC
IA Status
Facility Study

Wallie Storage

ERCOT-25INR0361BetaActiveBatteryERCOTLBNL

205.4 MW storage in Howard, TX · In queue since March 2023 · Proposed COD September 2027

205.4 MW

Capacity

1

Components

Battery

3y 2m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryMar 27, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-15

About

Wallie Storage, a proposed battery storage project in Howard County, Texas, is being developed by Wallie Storage, LLC. The project, with a total capacity of 205.4 MW, is currently in the ERCOT interconnection queue as entry ERCOT-25INR0361, with a queue entry date of March 27, 2023. The proposed commercial operation date is September 15, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project is linked to the existing Wallie Storage operating plant (EIA ID 67668).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Howard

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Wallie Storage, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 11324 Leatherwood POD - 1326 Stanton East Switch

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Big Spring West Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Wallie Storage