Blossomheath BESS (ERCOT-25INR0399) — Project Summary

Queue ID
ERCOT-25INR0399
Capacity
300.78 MW
Technology
Battery
Status
active
Location
Ellis, TX
Region
ERCOT
Developer
Taurbeng LLC
IA Status
Facility Study

Blossomheath BESS

ERCOT-25INR0399BetaActiveBatteryERCOTLBNL

300.78 MW storage in Ellis, TX · In queue since May 2023 · Proposed COD November 2026

300.78 MW

Capacity

1

Components

Battery

3 years

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

3y 6m

Facilities Study50%
Queue EntryMay 26, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-11-28

About

The Blossomheath BESS project is a proposed 300.78 MW battery storage project located in Ellis County, Texas. Developed by Taurbeng LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0399, with a queue entry date of May 26, 2023. The proposed commercial operation date is November 28, 2026, and the project is currently in the Facility Study phase of the interconnection process.

The point of interconnection for the Blossomheath BESS project is the tap VENUS SWITCH (#1907) _x0013_ SAM SWITCH (#68090) 345 kV line. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ellis

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Taurbeng LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap VENUS SWITCH (#1907) _x0013_ SAM SWITCH (#68090) 345 kV line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.