Maldives Solar (Alternate POI)
184 MW generation in Scurry, TX · In queue since July 2023 · Proposed COD March 2028
184 MW
Capacity
1
Components
Solar
2y 10m
In Queue
IA Executed
IA Status
Signed Dec 2023
Queue → IA
5 months
IA → COD
4y 3m
Total Duration
5 months
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2028-03-20
The Maldives Solar (Alternate POI) project is a proposed 184 MW solar generation project located in Scurry County, Texas. Developed by Maldives Solar LLC, the project consists of 184 MW of solar photovoltaic generation.
The project is listed in the ERCOT interconnection queue as project ERCOT-25INR0400, with a queue entry date of July 18, 2023, and a proposed commercial operation date of March 20, 2028. The project's Interconnection Agreement (IA) has been executed as of December 1, 2023. The point of interconnection (POI) is Tap 345kV 59900 Long Draw - 11318 Scurry County South and 345kV 59905 Faraday - 11318 Scurry County South.
Generated from interconnection queue and public data sources
State
TX
County
Scurry
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Maldives Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 59900 Long Draw - 11318 Scurry County South and 345kV 59905 Faraday - 11318 Scurry County South
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- BOCO_ESS_RN
- POI Substation
- Long Draw Substation