Aldrin 345 BESS (ERCOT-25INR0425) — Project Summary

Queue ID
ERCOT-25INR0425
Capacity
362 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Aldrin Energy Storage LLC
IA Status
IA Executed

Aldrin 345 BESS

ERCOT-25INR0425BetaActiveBatteryERCOTLBNL + Live

362 MW storage in Brazoria, TX · In queue since May 2023 · Proposed COD December 2027

362 MW

Capacity

1

Components

Battery

3 years

In Queue

IA Executed

IA Status

Signed Jun 2024

Interconnection

Queue → IA

1y 1m

IA → COD

3y 6m

Total Duration

1y 1m

Construction75%
Queue EntryMay 15, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJun 15, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2027-12-01

About

The Aldrin 345 BESS project is a proposed 362 MW battery storage project located in Brazoria County, Texas. Developed by Aldrin Energy Storage LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0425, with a queue entry date of May 15, 2023.

The proposed commercial operation date for the Aldrin 345 BESS project is December 1, 2027. The project has an executed Interconnection Agreement (IA), with the IA executed on June 15, 2024. The point of interconnection is the Meadow 345kV substation (Bus: 43030).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Aldrin Energy Storage LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

(Bus: 43030) Meadow 345kV substation

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.