Stephens Ranch Wind Repower
12.4 MW generation in Borden, TX · In queue since June 2023 · Proposed COD October 2027
12.4 MW
Capacity
1
Components
Wind
2y 11m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-01
The Stephens Ranch Wind Repower is a proposed wind generation project located in Borden County, Texas, with a total capacity of 12.4 MW. Developed by Stephens Ranch Wind Energy, LLC, the project consists of 12.4 MW of wind power. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0439, with a queue entry date of June 28, 2023.
The proposed commercial operation date for the Stephens Ranch Wind Repower is October 1, 2027. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is the 59900 Long Draw 345 kV location. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Borden
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Stephens Ranch Wind Energy, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
59900 Long Draw 345 kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- BOCO_ESS_RN
- POI Substation
- Long Draw Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.