Bronc Rodeo Solar Project (ERCOT-25INR0440) — Project Summary

Queue ID
ERCOT-25INR0440
Capacity
121.63 MW
Technology
Solar
Status
active
Location
Falls, TX
Region
ERCOT
Developer
Energiekontor US Texas SP 16 LLC
IA Status
Facility Study

Bronc Rodeo Solar Project

ERCOT-25INR0440BetaActiveSolarERCOTLBNL + Live

121.63 MW generation in Falls, TX · In queue since May 2023 · Proposed COD April 2028

121.63 MW

Capacity

1

Components

Solar

3 years

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryMay 3, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-17

About

The proposed Bronc Rodeo Solar Project is a 121.63 MW solar generation project located in Falls County, Texas. Developed by Energiekontor US Texas SP 16 LLC, the project consists of 121.63 MW of solar photovoltaic generation.

The project is currently in the ERCOT interconnection queue as entry ERCOT-25INR0440, with a queue entry date of May 3, 2023. Its proposed commercial operation date is April 17, 2028, and its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the Tap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Falls

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Energiekontor US Texas SP 16 LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Bronc Rodeo Solar Project