Tres Rios Ranch BESS (ERCOT-25INR0451) — Project Summary

Queue ID
ERCOT-25INR0451
Capacity
290 MW
Technology
Battery
Status
active
Location
Upton, TX
Region
ERCOT
Developer
LectricWind LLC
IA Status
Facility Study

Tres Rios Ranch BESS

ERCOT-25INR0451BetaActiveBatteryERCOTLBNL + Live

290 MW storage in Upton, TX · In queue since May 2023 · Proposed COD December 2027

290 MW

Capacity

1

Components

Battery

3 years

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 7m

Facilities Study50%
Queue EntryMay 26, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

The Tres Rios Ranch BESS is a proposed 290 MW battery storage project in Upton County, Texas. Developed by LectricWind LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0451, with a queue entry date of May 26, 2023. Its proposed commercial operation date is December 31, 2027, and its interconnection agreement status is currently in the Facility Study phase.

The project consists of 290 MW of battery storage capacity. The point of interconnection is the 76008 Twelvemile 345kV location. The Tres Rios Ranch BESS project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Upton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

LectricWind LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

76008 Twelvemile 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.