Spaniel Farm Solar Project
100.52 MW generation in Ellis, TX · In queue since May 2023 · Proposed COD April 2027
100.52 MW
Capacity
1
Components
Solar
3 years
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
3y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-04-12
The Spaniel Farm Solar Project is a proposed 100.52 MW solar generation project located in Ellis County, Texas. Developed by Energiekontor US Texas SP 18 LLC, the project consists of 100.52 MW of solar photovoltaic generation. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0452, with a queue entry date of May 3, 2023, and a proposed commercial operation date of April 12, 2027. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection (POI) for the Spaniel Farm Solar Project is Tap 138 kV 2241 Ennis West Switch - 12320 Templeton. The project has appeared in recent news coverage regarding renewable energy development in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Ellis
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Energiekontor US Texas SP 18 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV 2241 Ennis West Switch - 12320 Templeton
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.