Spaniel Farm Solar Project (ERCOT-25INR0452) — Project Summary

Queue ID
ERCOT-25INR0452
Capacity
100.52 MW
Technology
Solar
Status
active
Location
Ellis, TX
Region
ERCOT
Developer
Energiekontor US Texas SP 18 LLC
IA Status
Facility Study

Spaniel Farm Solar Project

ERCOT-25INR0452BetaActiveSolarERCOTLBNL

100.52 MW generation in Ellis, TX · In queue since May 2023 · Proposed COD April 2027

100.52 MW

Capacity

1

Components

Solar

3 years

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 11m

Facilities Study50%
Queue EntryMay 3, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-04-12

About

The Spaniel Farm Solar Project is a proposed 100.52 MW solar generation project located in Ellis County, Texas. Developed by Energiekontor US Texas SP 18 LLC, the project consists of 100.52 MW of solar photovoltaic generation. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0452, with a queue entry date of May 3, 2023, and a proposed commercial operation date of April 12, 2027. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection (POI) for the Spaniel Farm Solar Project is Tap 138 kV 2241 Ennis West Switch - 12320 Templeton. The project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ellis

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Energiekontor US Texas SP 18 LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138 kV 2241 Ennis West Switch - 12320 Templeton

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Spaniel Farm Solar Project