Surfside Energy Storage (ERCOT-25INR0458) — Project Summary

Queue ID
ERCOT-25INR0458
Capacity
50.34 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Rocky Mountain Energy Holdings, LLC
IA Status
Facility Study

Surfside Energy Storage

ERCOT-25INR0458BetaActiveBatteryERCOTLBNL + Live

50.34 MW storage in Brazoria, TX · In queue since July 2023 · Proposed COD December 2028

50.34 MW

Capacity

1

Components

Battery

2y 10m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5y 5m

Facilities Study50%
Queue EntryJul 19, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

About

The Surfside Energy Storage project is a proposed 50.34 MW battery energy storage system in Brazoria County, Texas. Developed by Rocky Mountain Energy Holdings, LLC, the project is located within the ERCOT region and has been assigned queue ID ERCOT-25INR0458. The project entered the ERCOT interconnection queue on July 19, 2023, with a proposed commercial operation date of December 31, 2028. Its interconnection status is currently in the Facility Study phase.

The Surfside Energy Storage project has been mentioned in recent news coverage related to grid development.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Rocky Mountain Energy Holdings, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 42110 Angleton _x0013_ 43150 Riwood ckt 82

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Surfside Energy Storage