Bocanova Power
150.46 MW storage in Brazoria, TX · In queue since June 2023 · Proposed COD July 2025
150.46 MW
Capacity
1
Components
Battery
2y 11m
In Queue
IA Executed
IA Status
Signed Feb 2024
Queue → IA
8 months
IA → COD
1y 5m
Total Duration
8 months
Schedule
10 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2025-07-19
Bocanova Power is a proposed 150.46 MW battery storage project located in Brazoria County, Texas. The project, developed by Bocanova Power LLC, consists entirely of battery technology. It is listed in the ERCOT interconnection queue as entry ERCOT-25INR0467, with a queue entry date of June 7, 2023, and a proposed commercial operation date of July 19, 2025. The project's interconnection agreement has been executed as of February 26, 2024.
The project is linked with 92% confidence to the existing Bocanova Energy Storage operating plant (EIA plant ID 68879). Bocanova Power has been the subject of recent news coverage, with seven articles appearing in industry and grid publications.
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Bocanova Power LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
39030 TNALVIN 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- BCNV_RN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26