Willow Beach Wind (ERCOT-25INR0494) — Project Summary

Queue ID
ERCOT-25INR0494
Capacity
202.33 MW
Technology
Wind
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
ACE DevCo NC LLC
IA Status
Facility Study

Willow Beach Wind

ERCOT-25INR0494BetaActiveWindERCOTLBNL + Live

202.33 MW generation in Brazoria, TX · In queue since October 2023 · Proposed COD October 2027

202.33 MW

Capacity

1

Components

Wind

2y 7m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4 years

Facilities Study50%
Queue EntryOct 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-01

About

The Willow Beach Wind project is a proposed 202.33 MW wind generation facility in Brazoria County, Texas. Developed by ACE DevCo NC LLC, the project consists of 202.33 MW of wind capacity. It is listed in the ERCOT interconnection queue as entry ERCOT-25INR0494, with a queue entry date of October 13, 2023, and a proposed commercial operation date of October 1, 2027. The project's interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Willow Beach Wind operating plant (EIA ID 68090). Recent news coverage of the project includes regulatory matters.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ACE DevCo NC LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138 kV Bus# 42100 HUD_8 _x0013_ Bus# 42960 MUSTNG_S04_8 138kV CKT# 4

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW
POI Substation
Amoco Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Willow Beach Wind