Uhland Maxwell Expansion (ERCOT-25INR0503) — Project Summary

Queue ID
ERCOT-25INR0503
Capacity
188.4 MW
Technology
Gas
Status
active
Location
Caldwell, TX
Region
ERCOT
Developer
Lower Colorado River Authority
IA Status
IA Executed

Uhland Maxwell Expansion

ERCOT-25INR0503BetaActiveGasERCOTLBNL + Live

188.4 MW generation in Caldwell, TX · In queue since September 2023 · Proposed COD April 2026

188.4 MW

Capacity

1

Components

Gas

2y 8m

In Queue

IA Executed

IA Status

Signed Dec 2023

Interconnection

Queue → IA

3 months

IA → COD

2y 4m

Total Duration

3 months

Schedule

0 months past proposed COD

Construction75%
Queue EntrySep 22, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 28, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2026-04-30

About

The Uhland Maxwell Expansion is a proposed 188.4 MW gas-fired generation project located in Caldwell County, Texas. The developer is Lower Colorado River Authority. It is interconnected within the ERCOT region under queue ID ERCOT-25INR0503, with a queue entry date of September 22, 2023, and a proposed commercial operation date of April 30, 2026.

The project's Interconnection Agreement (IA) has been executed as of December 28, 2023. The point of interconnection (POI) is the 7041 John Dumas 345kV substation.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Caldwell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lower Colorado River Authority

Utility

Entity

ERCOT

Service Type

Point of Interconnection

7041 John Dumas 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Uhland Maxwell Expansion