Lazy Frog Solar SLF
105.8 MW generation in Franklin, TX · In queue since September 2023 · Proposed COD April 2028
105.8 MW
Capacity
1
Components
Solar
2y 8m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-17
The Lazy Frog Solar SLF project is a proposed solar generation facility with a total capacity of 105.8 MW. Located in Franklin County, Texas, the project is being developed by Lazy Frog Solar, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-25INR0504, with a queue entry date of September 22, 2023. The proposed commercial operation date is April 17, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The proposed project consists of 105.8 MW of solar generation. The point of interconnection is the 11688 Thorn Tree Switch 345kV. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Franklin
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Lazy Frog Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
11688 Thorn Tree Switch 345kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Lazy Frog Solar SLF