Mud Cat Solar SLF (ERCOT-25INR0505) — Project Summary

Queue ID
ERCOT-25INR0505
Capacity
100.5 MW
Technology
Solar
Status
active
Location
Lamar, TX
Region
ERCOT
Developer
Mud Cat Solar, LLC
IA Status
Facility Study

Mud Cat Solar SLF

ERCOT-25INR0505BetaActiveSolarERCOTLBNL + Live

100.5 MW generation in Lamar, TX · In queue since October 2023 · Proposed COD September 2028

100.5 MW

Capacity

1

Components

Solar

2y 7m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryOct 20, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-18

About

Mud Cat Solar SLF is a proposed solar generation project located in Lamar County, Texas. The project, developed by Mud Cat Solar, LLC, has a total capacity of 100.5 MW. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0505, with a queue entry date of October 20, 2023. The proposed commercial operation date is September 18, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for Mud Cat Solar SLF is Tap 138KV 11768 Hawk Hollow _x0013_ 1768 Deport. The project consists of 100.5 MW of solar photovoltaic generation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Lamar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mud Cat Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138KV 11768 Hawk Hollow _x0013_ 1768 Deport

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Mud Cat Solar SLF