Mud Cat Solar SLF
100.5 MW generation in Lamar, TX · In queue since October 2023 · Proposed COD September 2028
100.5 MW
Capacity
1
Components
Solar
2y 7m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-18
Mud Cat Solar SLF is a proposed solar generation project located in Lamar County, Texas. The project, developed by Mud Cat Solar, LLC, has a total capacity of 100.5 MW. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0505, with a queue entry date of October 20, 2023. The proposed commercial operation date is September 18, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The point of interconnection for Mud Cat Solar SLF is Tap 138KV 11768 Hawk Hollow _x0013_ 1768 Deport. The project consists of 100.5 MW of solar photovoltaic generation. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Lamar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Mud Cat Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138KV 11768 Hawk Hollow _x0013_ 1768 Deport
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.